CHAMPS ELYSEES SOLAR AND BESS
ABOUT THIS SITE
Milam County
ERCOT North
TSP: Oncor
250 MW
2-hour duration
345 kV interconnection at an existing transmission line
Over 300 acres and growing
Milam County
ERCOT North
TSP: Oncor
250 MW
2-hour duration
345 kV interconnection at an existing transmission line
Over 300 acres and growing