HAUTE STOCKAGE
ABOUT THIS SITE
Shackleford County
ERCOT West
TSP: Oncor
300 MW
2-hour duration
345 kV interconnection
14.5 acres at an existing substation
Shackleford County
ERCOT West
TSP: Oncor
300 MW
2-hour duration
345 kV interconnection
14.5 acres at an existing substation