LONESOME DOVE BESS
ABOUT THIS SITE
Throckmorton County
ERCOT West
TSP: Oncor
250 MW
2-hour duration
345 kV interconnection
11 acres at an existing transmission line
Throckmorton County
ERCOT West
TSP: Oncor
250 MW
2-hour duration
345 kV interconnection
11 acres at an existing transmission line